Back to Production
CC-J-26018
48 × S144 Caesar
Workshop job
Details
- Status
- Ready to dispatch
- Order
- CC-O-26018
- Finish
- Brushed steel
- Work area
- Frame workshop
- Due date
- 14 Nov 2026
- Scheduled date
- 15 Nov 2026
- Allocated material
- Contract upholstery, rust
- Material requirement
- 57.599999999999994 m
- Allocation status
- 175 m on hand
- Specifications
- Approved
Production stages
Six workshop stages. Frame preparation issues the recorded allocated fabric; insufficient stock blocks the move.
Design approval
Materials allocated
Frame preparation
Upholstery
Finishing
Ready to dispatch
Notes
Illustrative fabric requirement: 1.2m per unit. Confirm actual cut plan.
Order context
Portside Hotel Group · Dining room refresh
CC-O-26018