18 Nov 2026Demo
Back to Production
CC-J-26018

48 × S144 Caesar

Workshop job

Details

Status
Ready to dispatch
Finish
Brushed steel
Work area
Frame workshop
Due date
14 Nov 2026
Scheduled date
15 Nov 2026
Allocated material
Contract upholstery, rust
Material requirement
57.599999999999994 m
Allocation status
175 m on hand
Specifications
Approved

Production stages

Six workshop stages. Frame preparation issues the recorded allocated fabric; insufficient stock blocks the move.

Design approval
Materials allocated
Frame preparation
Upholstery
Finishing
Ready to dispatch

Notes

Illustrative fabric requirement: 1.2m per unit. Confirm actual cut plan.

Order context

Portside Hotel Group · Dining room refresh

CC-O-26018