18 Nov 2026Demo
Back to Production
CC-J-26016

44 × C056 Alver

Workshop job

Details

Status
Upholstery
Finish
Natural ash
Work area
Upholstery workshop
Due date
29 Nov 2026
Scheduled date
22 Nov 2026
Material requirement
52.8 m
Allocation status
4 m on hand
Specifications
Approved

Production stages

Six workshop stages. Frame preparation issues the recorded allocated fabric; insufficient stock blocks the move.

Design approval
Materials allocated
Frame preparation
Upholstery
Finishing
Ready to dispatch

Notes

Illustrative fabric requirement: 1.2m per unit. Confirm actual cut plan.

Order context

Manly Function Rooms · Members lounge refurbishment

CC-O-26016