18 Nov 2026Demo
Back to Production
CC-J-26015

42 × C055 Palm

Workshop job

Details

Status
Frame preparation
Finish
American oak
Work area
Frame workshop
Due date
28 Nov 2026
Scheduled date
21 Nov 2026
Allocated material
Contract upholstery, sand
Material requirement
50.4 m
Allocation status
190 m on hand
Specifications
Approved

Production stages

Six workshop stages. Frame preparation issues the recorded allocated fabric; insufficient stock blocks the move.

Design approval
Materials allocated
Frame preparation
Upholstery
Finishing
Ready to dispatch

Notes

Illustrative fabric requirement: 1.2m per unit. Confirm actual cut plan.

Order context

Newcastle Members Club · Outdoor dining selection

CC-O-26015