18 Nov 2026Demo
Back to Production
CC-J-26013

38 × C045 Holly

Workshop job

Details

Status
Design approval
Finish
Oak veneer
Work area
Upholstery workshop
Due date
26 Nov 2026
Scheduled date
19 Nov 2026
Allocated material
Contract upholstery, teal
Material requirement
45.6 m
Allocation status
160 m on hand
Specifications
Awaiting approval

Production stages

Six workshop stages. Frame preparation issues the recorded allocated fabric; insufficient stock blocks the move.

Design approval
Materials allocated
Frame preparation
Upholstery
Finishing
Ready to dispatch

Notes

Illustrative fabric requirement: 1.2m per unit. Confirm actual cut plan.

Order context

Harbour Lane Hospitality · Gaming lounge fitout

CC-O-26013