Back to Production
CC-J-26012
36 × C044 Moose
Workshop job
Details
- Status
- Ready to dispatch
- Order
- CC-O-26012
- Finish
- American oak
- Work area
- Frame workshop
- Due date
- 25 Nov 2026
- Scheduled date
- 18 Nov 2026
- Allocated material
- Contract upholstery, charcoal
- Material requirement
- 43.199999999999996 m
- Allocation status
- 4 m on hand
- Specifications
- Approved
Production stages
Six workshop stages. Frame preparation issues the recorded allocated fabric; insufficient stock blocks the move.
Design approval
Materials allocated
Frame preparation
Upholstery
Finishing
Ready to dispatch
Notes
Illustrative fabric requirement: 1.2m per unit. Confirm actual cut plan.
Order context
Paddington Interiors · Dining room refresh
CC-O-26012