18 Nov 2026Demo
Back to Production
CC-J-26011

34 × C043 Laura

Workshop job

Details

Status
Finishing
Finish
American oak
Work area
Finishing bench
Due date
24 Nov 2026
Scheduled date
17 Nov 2026
Allocated material
Contract upholstery, sand
Material requirement
40.8 m
Allocation status
190 m on hand
Specifications
Approved

Production stages

Six workshop stages. Frame preparation issues the recorded allocated fabric; insufficient stock blocks the move.

Design approval
Materials allocated
Frame preparation
Upholstery
Finishing
Ready to dispatch

Notes

Illustrative fabric requirement: 1.2m per unit. Confirm actual cut plan.

Order context

Geelong Coastal Club · Function room seating

CC-O-26011