Back to Production
CC-J-26011
34 × C043 Laura
Workshop job
Details
- Status
- Finishing
- Order
- CC-O-26011
- Finish
- American oak
- Work area
- Finishing bench
- Due date
- 24 Nov 2026
- Scheduled date
- 17 Nov 2026
- Allocated material
- Contract upholstery, sand
- Material requirement
- 40.8 m
- Allocation status
- 190 m on hand
- Specifications
- Approved
Production stages
Six workshop stages. Frame preparation issues the recorded allocated fabric; insufficient stock blocks the move.
Design approval
Materials allocated
Frame preparation
Upholstery
Finishing
Ready to dispatch
Notes
Illustrative fabric requirement: 1.2m per unit. Confirm actual cut plan.
Order context
Geelong Coastal Club · Function room seating
CC-O-26011