18 Nov 2026Demo
Back to Production
CC-J-26010

32 × C042 Princess

Workshop job

Details

Status
Upholstery
Finish
European beech
Work area
Upholstery workshop
Due date
23 Nov 2026
Scheduled date
16 Nov 2026
Allocated material
Contract upholstery, rust
Material requirement
38.4 m
Allocation status
175 m on hand
Specifications
Approved

Production stages

Six workshop stages. Frame preparation issues the recorded allocated fabric; insufficient stock blocks the move.

Design approval
Materials allocated
Frame preparation
Upholstery
Finishing
Ready to dispatch

Notes

Illustrative fabric requirement: 1.2m per unit. Confirm actual cut plan.

Order context

Southbank Events · Members lounge refurbishment

CC-O-26010