18 Nov 2026Demo
Back to Production
CC-J-26009

30 × C041 Bunny

Workshop job

Details

Status
Frame preparation
Finish
American oak
Work area
Frame workshop
Due date
22 Nov 2026
Scheduled date
15 Nov 2026
Allocated material
Contract upholstery, teal
Material requirement
36 m
Allocation status
160 m on hand
Specifications
Approved

Production stages

Six workshop stages. Frame preparation issues the recorded allocated fabric; insufficient stock blocks the move.

Design approval
Materials allocated
Frame preparation
Upholstery
Finishing
Ready to dispatch

Notes

Illustrative fabric requirement: 1.2m per unit. Confirm actual cut plan.

Order context

Fitzroy House Hotel · Outdoor dining selection

CC-O-26009