CC-J-26007
26 × C035 Kristy
Workshop job
Details
- Status
- Design approval
- Order
- CC-O-26007
- Finish
- American oak
- Work area
- Upholstery workshop
- Due date
- 20 Nov 2026
- Scheduled date
- 22 Nov 2026
- Allocated material
- Contract upholstery, sand
- Material requirement
- 31.2 m
- Allocation status
- 190 m on hand
- Specifications
- Awaiting approval
Production stages
Six workshop stages. Frame preparation issues the recorded allocated fabric; insufficient stock blocks the move.
Design approval
Materials allocated
Frame preparation
Upholstery
Finishing
Ready to dispatch
Notes
Illustrative fabric requirement: 1.2m per unit. Confirm actual cut plan.
Order context
Riverbank RSL · Gaming lounge fitout
CC-O-26007