Back to Production
CC-J-26006
24 × C667A Luka Arms
Workshop job
Details
- Status
- Ready to dispatch
- Order
- CC-O-26006
- Finish
- Woodgrain aluminium
- Work area
- Frame workshop
- Due date
- 19 Nov 2026
- Scheduled date
- 21 Nov 2026
- Allocated material
- Contract upholstery, rust
- Material requirement
- 28.799999999999997 m
- Allocation status
- 175 m on hand
- Specifications
- Approved
Production stages
Six workshop stages. Frame preparation issues the recorded allocated fabric; insufficient stock blocks the move.
Design approval
Materials allocated
Frame preparation
Upholstery
Finishing
Ready to dispatch
Notes
Illustrative fabric requirement: 1.2m per unit. Confirm actual cut plan.
Order context
Carlton Dining Group · Dining room refresh
CC-O-26006