18 Nov 2026Demo
Back to Production
CC-J-26005

22 × C667 Luka

Workshop job

Details

Status
Finishing
Finish
Woodgrain aluminium
Work area
Finishing bench
Due date
18 Nov 2026
Scheduled date
20 Nov 2026
Allocated material
Contract upholstery, teal
Material requirement
26.4 m
Allocation status
160 m on hand
Specifications
Approved

Production stages

Six workshop stages. Frame preparation issues the recorded allocated fabric; insufficient stock blocks the move.

Design approval
Materials allocated
Frame preparation
Upholstery
Finishing
Ready to dispatch

Notes

Illustrative fabric requirement: 1.2m per unit. Confirm actual cut plan.

Order context

Mornington Venue Projects · Function room seating

CC-O-26005