18 Nov 2026Demo
Back to Production
CC-J-26004

20 × C637 Newish

Workshop job

Details

Status
Upholstery
Finish
Black powder coat
Work area
Upholstery workshop
Due date
17 Nov 2026
Scheduled date
19 Nov 2026
Material requirement
24 m
Allocation status
4 m on hand
Specifications
Approved

Production stages

Six workshop stages. Frame preparation issues the recorded allocated fabric; insufficient stock blocks the move.

Design approval
Materials allocated
Frame preparation
Upholstery
Finishing
Ready to dispatch

Notes

Illustrative fabric requirement: 1.2m per unit. Confirm actual cut plan.

Order context

Richmond Hotel Collective · Members lounge refurbishment

CC-O-26004