Back to Production
CC-J-26003
18 × C054 Dirk
Workshop job
Details
- Status
- Frame preparation
- Order
- CC-O-26003
- Finish
- Natural ash
- Work area
- Frame workshop
- Due date
- 16 Nov 2026
- Scheduled date
- 18 Nov 2026
- Allocated material
- Contract upholstery, charcoal
- Material requirement
- 21.599999999999998 m
- Allocation status
- 4 m on hand
- Specifications
- Approved
Production stages
Six workshop stages. Frame preparation issues the recorded allocated fabric; insufficient stock blocks the move.
Design approval
Materials allocated
Frame preparation
Upholstery
Finishing
Ready to dispatch
Notes
Illustrative fabric requirement: 1.2m per unit. Confirm actual cut plan.
Order context
North Wharf Design Studio · Outdoor dining selection
CC-O-26003