18 Nov 2026Demo
Back to Production
CC-J-26003

18 × C054 Dirk

Workshop job

Details

Status
Frame preparation
Finish
Natural ash
Work area
Frame workshop
Due date
16 Nov 2026
Scheduled date
18 Nov 2026
Material requirement
21.599999999999998 m
Allocation status
4 m on hand
Specifications
Approved

Production stages

Six workshop stages. Frame preparation issues the recorded allocated fabric; insufficient stock blocks the move.

Design approval
Materials allocated
Frame preparation
Upholstery
Finishing
Ready to dispatch

Notes

Illustrative fabric requirement: 1.2m per unit. Confirm actual cut plan.

Order context

North Wharf Design Studio · Outdoor dining selection

CC-O-26003