18 Nov 2026Demo
Back to Production
CC-J-26002

16 × C007 Lars

Workshop job

Details

Status
Dispatched
Finish
American oak
Work area
Finishing bench
Due date
15 Nov 2026
Scheduled date
17 Nov 2026
Allocated material
Contract upholstery, rust
Material requirement
19.2 m
Allocation status
175 m on hand
Specifications
Approved

Production stages

Six workshop stages. Frame preparation issues the recorded allocated fabric; insufficient stock blocks the move.

Design approval
Materials allocated
Frame preparation
Upholstery
Finishing
Ready to dispatch

Notes

Illustrative fabric requirement: 1.2m per unit. Confirm actual cut plan.

Order context

Bayside Hospitality Group · Custom banquette project

CC-O-26002