18 Nov 2026Demo
Back to Production
CC-J-26001

14 × C006 Dowel

Workshop job

Details

Status
Dispatched
Finish
American oak
Work area
Upholstery workshop
Due date
14 Nov 2026
Scheduled date
16 Nov 2026
Allocated material
Contract upholstery, teal
Material requirement
16.8 m
Allocation status
160 m on hand
Specifications
Approved

Production stages

Six workshop stages. Frame preparation issues the recorded allocated fabric; insufficient stock blocks the move.

Design approval
Materials allocated
Frame preparation
Upholstery
Finishing
Ready to dispatch

Notes

Illustrative fabric requirement: 1.2m per unit. Confirm actual cut plan.

Order context

Yarra Social Club · Gaming lounge fitout

CC-O-26001